Logo for Quanta Services, Inc.

Construction Scheduler - Data Center Delivery (Texas based Project Sites)

Role overview

Qualifications

  • 4-10 years of scheduling experience in Engineering/Procurement/Construction (EPC) industry
  • Data center or Commercial Infrastructure P6 scheduling experience
  • Primavera P6 expertise, including cost- and resource-loaded schedule development
  • Familiarity with Deltek Acumen Fuse/Risk, or similar schedule analysis tools

Responsibilities

  • Develop and maintain CPM schedules
  • Build and update resource- and cost-loaded Primavera P6 schedules
  • Conduct critical path analysis, what-if scenarios, productivity tracking, and time-impact assessments
  • Maintain compliant schedule documentation per contract and company standards

Key facts

Hard skills

Other skills

  • Forecasting
  • Scheduling
  • Communication
  • Self-Motivation

About the company

Quanta Services, Inc. logo

Quanta Services, Inc.

  • Construction
  • 10,001+
Quanta Services (NYSE: PWR) is the leading specialty contractor with the largest and highly trained skilled workforce in North America – providing fully integrated solutions for the electric power, pipeline, industrial and communications industries. Electric Power • Transmission • Distribution • Substation • EPC • Underground Electric • Program Management • Distribution Engineering • Energized Services • Renewable Power – Wind, Solar, etc. • Grid Modernization • Environmental Pipeline and Industrial • Pipelines and Facilities • Gas Distribution • Horizontal Directional Drilling • Integrity Services • Technical Services • Trucking and Logistics • Trenching and Excavation • Tank Construction • Power Plant Construction • Engineering • Environmental Communications • Fiber to the Home (FTTH) • 5G Deployment • EPC • Long Haul Fiber Optic • Aerial and Underground • Wireless and Tower Solutions • Program Management • Environmental Part of what sets Quanta Services apart is the strength of our people. We have over 50,000 employees and are in all 50 states and more than 15 countries. In each and every office we employ the best and brightest and spend the time to properly train all employees in safety and Quanta procedures so that we can continue to be the safest and most innovative specialty contractor. • #244 on the 2023 Fortune 500 List • #1 2023 Healthiest Employer of Texas • #1 2020 Top 50 Electrical Contractors on EC&M's List • #2 2020 on The Houston Chronicle Top 100 List

Your match analysis

See how your profile stacks up against this role.

We compared the job requirements to your profile to show where you're strong and where you fall short.

Job description

About Us:

QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.


Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

About this Role:

Location: Remote (U.S.) with travel up to 30% to project sites in Texas.

QISG is seeking experienced Primavera P6 Schedulers to support major EPC, Design-Build, and CMAR projects.

Partner with Project Managers, Engineers, and field teams to develop and manage resource-loaded schedules from planning through construction and commissioning. Ideal candidates bring P6 scheduling experience in data centers, commercial infrastructure, or complex construction projects, with strong skills in critical path management, forecasting, and schedule execution.

What You'll Do:
  • Develop and maintain CPM schedules.

  • Build and update resource- and cost-loaded Primavera P6 schedules.

  • Integrate inputs from engineering, procurement, construction, and commissioning (intra-company or subcontractor) teams.

  • Link WBS to CBS for accurate forecasting, cash flow, and financial alignment.

  • Produce earned value metrics, schedule KPIs, and cash flow reports for project controls and executive reporting.

  • Conduct critical path analysis, what-if scenarios, productivity tracking, and time-impact assessments.

  • Identify schedule risks, evaluate sequencing, and recommend mitigation strategies.

  • Support look-ahead planning, short-interval schedules, and continuous improvement.

  • Maintain compliant schedule documentation per contract and company standards

What You'll Bring:
  • 4-10 years of scheduling experience in Engineering/Procurement/Construction (EPC) industry. 

  • Data center or Commercial Infrastructure P6 scheduling experience.
  • Primavera P6 expertise, including cost- and resource-loaded schedule development.
  • Experience with large-scale sitework, and long-lead equipment schedules for data center or commercial projects.

  • Familiarity with Deltek Acumen Fuse/Risk, or similar schedule analysis tools.

  • Ability to collaborate with engineering, permitting, procurement, construction, and commissioning teams.

  • Strong communication and influencing skills, coordinating across multiple departments.

  • Highly organized and self-motivated, able to manage multiple priorities in fast-paced environments.

  • Able and willing to travel up to 30% to domestic construction project sites or project offices. 
  • High school diploma required; Bachelor’s in Engineering, Construction Management, Business, or related field preferred.

What You'll Get:
  • Competitive base salary

  • Generous PTO & paid holidays to maintain work-life balance

  • 401(k) with a generous match to plan for your future

  • Comprehensive benefits – medical, dental, vision, and life insurance

  • Weekly pay for consistent, reliable compensation

  • Great mentoring & career growth opportunities – we invest in your development
    #LI-REMOTE

Equal Opportunity Employer:

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.

We are an Equal Opportunity Employer, including disability and protected veteran status.

We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Related jobs

See all Administrative Assistant jobs

Other jobs at Quanta Services, Inc.