Match score not available

DAS/Small Cell Construction Manager

72% Flex
Remote: 
Full Remote
Contract: 
Work from: 
California (USA)

Offer summary

Key responsabilities:

  • Manage construction in DAS assets
  • Supervise vendors and subcontractors effectively
  • Conduct site surveys and bid walks
MasTec Communications Group logo
MasTec Communications Group Telecommunication Services Large https://www.mastec.com/
5001 - 10000 Employees
See more MasTec Communications Group offers

Job description

Logo Jobgether

Your missions

Overview

Position Summary:

This position entails all phases of construction in DAS and small cell installation. Construction Managers must possess the ability to vet, maintain and supervise vendors/sub-contractors to ensure that they maintain our customer’s and our standards of quality of workmanship and safety.

  • Conduct site surveys and bid walks. This will include but is not limited to furnishing detailed site floor plans, photos, scope documents and any required RF Field surveys as needed.
  • Perform Pre construction walks to determine feasibility of constructing the DAS/small cell in accordance with in the dictates of the design.
  • Assist in the identification and qualification of the various subcontractors required for the project including all site and building trades.
  • Ability to interface with Routers, Switches and DAS controllers using a PC is essential.
  • Monitor and ensure performance and quality workmanship of contractors as well as internal employees.
  • Work closely with the contractor, and addition to the general requirements listed above.
  • It is vital for the continued success of the Pa/NJ/DE Market that the Roles and responsibilities are clearly defined. As such, below are market specific Roles and Responsibilities required of the Market CM in order for the markets’ continued success.
  • Support and time management of FE/Installer in market.
  • Daily task assignment of the FE is the responsibility of the market CM
  • In parallel with this, the implementation manager should be given a weekly schedule for the FE. This is due to the implementation manager by EOD Thursdays for the following week. If mid-week changes are required, an email to the Implementation Manager and PM are required.
  • Daily support should be given to the installation staff in market. This is to include the training of said personnel on best installation practices as well as the general flow of any given project, ie… Scoping Walk, Vendor selection, material procurement, installation, integration, commissioning, RF Opto., closeout requirements.
  • Daily site status update submission to the Market PM- This should be an inclusive report. - Current site status - Work to be completed in the upcoming week - Forecasted dates for milestones.
  • Daily site Visits.- All projects in active stages of construction should be physically visited by the Market CM several times per week. It is vital that this visit takes place. As a CM your personal update on the site should never be more several days old. It is also highly recommended that photos are taken each time you visit a site with all construction progress that what not already documented via photo on your last visit.
  • Conference Calls- It is Vital that you are present and accounted for on all conference calls that have bearing on sites currently in your que. As a CM, all your site updates should be communicated to the Market PM prior to any scheduled conference call in a timely manner to allow for them to assess the update. It is also vital that you are on said calls should the customer raise any question that were not covered in the update to the Market PM.
  • Bid Report Workups- The Workups should be a single point of reference for the entire project from a proposal perspective. It is vital that every tab is completed with all of the information available. This includes but it not limited to.- RFDS - IBWave Design - Design BOM - Vendor BOM (it is not sufficient to have a material price without the supporting materials list from the vendor) - SOW Bid Walk Notes. (These should be the walk notes either provided by AT&T for bid purposes or created by the CM). The vendors SOW belongs in the tab with their quote.
  • Driver Tab should be filled out in its entirety. Integration and commissioning drivers can be provided by the design team (Pavan). - ENG Workup Tab.

Qualifications

#MasTecCommunicationsGroup #MasTecCommunicationsCareers #ByersEngineeringCompany #DecisiveCommunications #MasTecNetworkSolutions #QuadGen #RhinoCableServices #RJCarrollCompany #SEFNCOCommunications #WycoFieldServices #MasTecFamily

Required profile

Experience

Industry :
Telecommunication Services
Spoken language(s):
English
Check out the description to know which languages are mandatory.

Soft Skills

  • Interpersonal Skills
  • Leadership
  • Time Management
  • Attention to Detail

Go Premium: Access the World's Largest Selection of Remote Jobs!

  • Largest Inventory: Dive into the world's largest remote job inventory. More than half of these opportunities can't be found on standard platforms.
  • Personalized Matches: Our AI-driven algorithms ensure you find job listings perfectly matched to your skills and preferences.
  • Application fast-lane: Discover positions where you rank in the TOP 5% of applicants, and get personally introduced to recruiters with Jobgether.
  • Try out our Premium Benefits with a 7-Day FREE TRIAL.
    No obligations. Cancel anytime.
Upgrade to Premium

Find other similar jobs